Will the current reserve be enough?
Rename, add, remove or reorder phases. Enter legal fees only here; record counsel, experts, mediators and other external costs separately below to avoid double-counting. Phase timing uses elapsed-month boundaries: 0 = today; 0–1 = month 1, 1–2 = month 2. The end boundary is exclusive. Each phase's costs are spread evenly between these boundaries. Only the portion within the forecast horizon is counted.
Forecast legal fees: $0
Include anticipated external expenditure such as counsel’s fees, expert reports, mediation fees, court fees and other third-party costs. Enter amounts based on your current estimates.
The chart includes legal fees and separately entered external costs, allocated to their specified months. It is an estimate, not a prediction.
Enter your assumptions to forecast the reserve position.
Transparent assumptions. Transparent arithmetic.
The Defence Cost Forecaster does not determine the appropriate reserve, deductible/excess treatment, defence strategy or expected future expenditure. You provide those professional assumptions. LegalMargin applies them mathematically.
Forecast horizon and milestone
The selected milestone is the end point for assessing reserve sufficiency. The forecast includes costs allocated to the final nominated month (for example, mediation fees in month 8 of an eight-month forecast). Costs allocated after that month are excluded and, where identified, disclosed separately.
Legal fees
In Simple estimate mode, future legal fees equal the average expected monthly legal fees multiplied by the number of months in the forecast horizon. In Detailed forecast mode, the user defines and edits phases, amounts and start/end months. Fees are spread evenly over each phase's period, with the end month treated as exclusive; only the part within the horizon is included. For example, start 0 and end 2 covers months 1 and 2; start 1 and end 2 covers month 2 only. The monthly schedule labels those periods as M1 and M2.
External costs and disbursements
External costs are entered separately from legal fees to avoid double-counting. Each cost can be allocated to a one-off month, spread evenly between selected months, or allocated using custom monthly amounts. A one-off cost entered for month 8 is included in an eight-month forecast. Where a cost spans the horizon, only the amount allocated within the horizon is included.
Reserve calculation and exhaustion
Gross future defence costs = forecast legal fees within the horizon + external costs and disbursements allocated within the horizon.
Projected insured future contribution = the lesser of gross future defence costs and the remaining deductible/excess amount entered by the user.
Projected insurer-funded future costs = gross future defence costs − projected insured future contribution.
Projected reserve remaining = current costs reserve − projected insurer-funded future costs. A negative result indicates a projected shortfall.
Reserve consumption is the projected insurer-funded expenditure divided by the current reserve, where the reserve is greater than zero. The exhaustion estimate uses the chronological expenditure allocation and applies the entered remaining deductible/excess before reducing the insurer's reserve. Timing is an estimate based on monthly assumptions, not a precise date.
Policy and forecast assumptions
Deductibles/excesses may be costs-inclusive or subject to other policy provisions. LegalMargin does not determine policy response, reserve adequacy, the correct deductible/excess treatment or the appropriate litigation strategy. Users must determine and verify those assumptions. Actual expenditure and timing may differ, and forecasts should be revisited as the matter progresses.
Please read before relying on a forecast.
LegalMargin performs calculations using the information and assumptions you enter. It does not determine which assumptions, methodologies, rates, costs, deductibles, reserves or other inputs are appropriate for a particular matter.
The Defence Cost Forecaster provides general information and illustrative calculations only. It is not legal, accounting, actuarial, insurance, financial or other professional advice. Actual defence expenditure, policy response, deductible treatment and reserve requirements may differ materially from the forecast.
You remain responsible for determining and verifying the inputs applicable to your circumstances and should independently verify the results before relying on them in advice, reserving, reporting, settlement, budgeting or other decisions.
To the maximum extent permitted by law, LegalMargin excludes liability for loss, damage, cost or expense arising from use of or reliance on this website or its outputs. Nothing excludes, restricts or modifies any right or remedy that cannot lawfully be excluded, restricted or modified.